Apollo Mission Critical Engineering company logo

Atlanta - Data Center Construction QA/QC Co-Op (QA/QC-C) - Spring/Summer 2026

Apollo Mission Critical Engineering

Mableton, GA

Full-time

Information Technology

About Us

Apollo is a Mission-Critical Infrastructure Engineering, Construction, Commissioning, and Operations Support Services Company. We serve mission-critical industries globally with commissioning, emergency response, operations support, and owner's representative services. Apollo is currently executing projects in multiple states in the United States, in Canada and Brazil.

Since our inception, we have built a commissioning firm based on trust, one relationship at a time. We hire the best people who can handle critical systems, love challenges, and thrive in a dynamic environment. We focus on understanding each client's needs and are relentless in meeting them.

Job Description

The Data Center Construction QAQC Co-Op Engineer (CxE-C) provides construction management, quality assurance and quality control support during the delivery of mission-critical data center facilities. They also participate in the supply chain coordination, inspection and validation of mechanical and electrical components, ensuring that delivered components meet the required specifications before installation and commissioning.

The QAQC-C partners with senior team members, project managers, construction contractors, equipment vendors, and client staff to monitor and ensure adherence to project specifications, quality standards and timelines throughout the construction process.

The QAQC-C provides construction support as part of Apollo's onsite, client-facing teams. Thus, this role may involve approximately 75% or more travel to various client locations.

Education

Relevant coursework towards a bachelor's or associate degree in engineering, construction management, supply chain & logistics, or a related discipline OR

One year of experience in the supply chain coordination, inspection, validation, and quality control of mechanical and/or electrical systems in a construction environment.

Key Responsibilities

  • Support the review of construction plans and design specifications to help identify quality and compliance requirements.
  • Collaborate with project managers and suppliers to ensure timely delivery and installation of electrical and mechanical components.
  • Work with the QAQC team to identify and address potential risks or areas for improvement during project execution.
  • Help prepare and maintain detailed documentation of inspections, tests, and quality reports for project teams.
  • Conduct pre-installation inspections under the guidance of senior QAQC team members.
  • Achieve certification for NFPA70E, OSHA 30, and other training as required.
  • Travel to other project locations as required.
  • Perform other duties as assigned.

Physical Demands

Role

The following physical demands must be met to successfully perform the essential functions of this role. Reasonable accommodations may be made to enable individuals with disabilities to perform these functions:

  • Frequently manipulating, moving, or grasping small parts, devices, or tools.
  • Frequently required to remain in a stationary position.
  • Frequently moving through office areas, critical facilities and other environments, including tight and confined spaces.
  • Exposure to low/high temperatures and outdoor elements such as precipitation and wind.
  • Working and walking on different types of terrain on active construction sites (e.g., concrete flooring, gravel, unpaved roads).
  • Frequently ascending and descending stairs and ladders to access equipment.
  • Frequently positioning oneself under or over equipment.
  • Frequently moving equipment weighing up to 50 pounds.

Qualifications

  • Basic knowledge of mechanical and electrical systems in construction
  • Strong communication and collaboration skills to work with cross-functional teams, including project managers and contractors
  • Skilled at using MS Office tools.
  • Ability to analyze and prepare reports and technical documents.
  • Ability to work under pressure and meet critical deadlines.
  • Must be detail oriented.

Prerequisites For Employment

  • Successful Background Check including pre-employment drug screening
  • US citizens, permanent residents or any candidate with eligibility to work in the US
  • Graduating in May 2027 or later

Apollo challenges the brightest, most talented, and driven individuals in the industry by providing an environment that embraces initiative, diversity, and achievement. We are an Equal Employment Opportunity, Affirmative Action employer supporting women, minorities, veterans and people with disabilities. We participate in the Department of Homeland Security E-Verify program.

About the company

Construction

At Apollo, we help our clients commission mission-critical assets that power tomorrow’s economy.

We are disciplined professionals with a focused will to make commissioning enjoyable while delivering competitively priced, high-quality results and testing services for our clients, safely and on time.

The Apollo Difference

We started with a clear aspiration: to build a company that is client-obsessed, people-powered, and purpose-driven.

From the beginning, we have focused on earning and maintaining trust, one client at a time. This has required hiring the best people, investing in their training and treating them well. It has taken unwavering focus on developing our people, understanding each client’s unique needs, and a relentless commitment to delivering results that exceed expectations.

At our core, we are dedicated to delivering extraordinary results through quality people, systems, and processes.