Ontario Transit Group - Ontario Line - Southern Civil, Stations & Tunnel
@ontario_transit_group
Toronto, Ontario ConstructionOverview
About Ontario Transit Group - Ontario Line - Southern Civil, Stations & Tunnel
Ontario Transit Group (OTG) is a joint venture between Ferrovial Construction and Vinci Construction Grands Projets (through their subsidiary JANIN ATLAS) to design, build and deliver the Ontario Line Subway - Southern Civil, Stations and Tunnel work for Metrolinx and Infrastructure Ontario. The south section of the line will join Exhibition Place to the Don Yard portal.
Scope of work for the Ontario Line South Civil design-build-finance package includes:
- A six-kilometre tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River)
- Groundworks required to build the tunnels and stations; utility and conduit works to prepare for the Rolling Stock, Systems, Operations and Maintenance (RSSOM) mechanical and electrical systems; guideway structures and facilities to prepare for the track structure to be installed by the RSSOM contractor.
- Stations: One above-ground station to be integrated with the existing GO Transit Exhibition Station. Two underground stations to be integrated with the existing TTC Osgoode and Queen subway stations. Four new underground stations (King/Bathurst, Queen/Spadina, Moss Park, Corktown).
When completed with the northern section of the Ontario Line, the new subway line will be a 15.6-kilometre subway line with 15 new stations to the and will connect Exhibition Place all the way to the Eglinton Crosstown LRT at Don Mills Road.
Scope of work for the Ontario Line South Civil design-build-finance package includes:
- A six-kilometre tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River)
- Groundworks required to build the tunnels and stations; utility and conduit works to prepare for the Rolling Stock, Systems, Operations and Maintenance (RSSOM) mechanical and electrical systems; guideway structures and facilities to prepare for the track structure to be installed by the RSSOM contractor.
- Stations: One above-ground station to be integrated with the existing GO Transit Exhibition Station. Two underground stations to be integrated with the existing TTC Osgoode and Queen subway stations. Four new underground stations (King/Bathurst, Queen/Spadina, Moss Park, Corktown).
When completed with the northern section of the Ontario Line, the new subway line will be a 15.6-kilometre subway line with 15 new stations to the and will connect Exhibition Place all the way to the Eglinton Crosstown LRT at Don Mills Road.
Headquarters
Toronto, OntarioWebsite
-Company Size
501-1,000 employeesIndustry
ConstructionCompany Type
PartnershipFounded
-Specialties
-Jobs

Civil Project Coordinator (Overnight Shift)
Ontario Transit Group - Ontario Line - Southern Civil, Stations & Tunnel
Toronto, Ontario, Canada

Bolter (Local 183)
Ontario Transit Group - Ontario Line - Southern Civil, Stations & Tunnel
Toronto, Ontario, Canada

Mechanical Foreman (SEM/Tunneling)
Ontario Transit Group - Ontario Line - Southern Civil, Stations & Tunnel
Toronto, Ontario, Canada